18.2.12

Testing the bridge / interchange module

The bridge module acts as central interchange allowing the trains to switch tracks. This was actually the first time I ran all my high speed passenger trains through the module. I also wanted to check that the trains passed the girders with sufficient clearance. In testing the bridge interchange module, I discovered some problem spots that caused derailments for my TGV and ICE1. Sigh.


No comments: